Testing & Commissioning

Tested. Verified. Ready for Service.

Network construction is only complete when performance has been verified and the infrastructure can be formally accepted.

Discuss Your Project →
Overview

End-to-End Delivery

Horus-PTS integrates engineering, field execution, specialist equipment, quality control, testing and documentation to deliver infrastructure that is safe, traceable and ready for operational use.

Tested. Verified. Ready for Service.
⌁

OTDR Testing

Verification of fibre length, attenuation, splice events and abnormal optical events.

±

Insertion Loss Measurement

End-to-end link-loss verification using calibrated optical sources and power meters.

↔

Continuity Testing

Confirmation that fibres are correctly connected through the route.

◉

Connector Inspection

End-face cleanliness and condition verification before testing.

▤

ODF Verification

Port allocation, labelling and termination verification.

↻

Defect Rectification

Investigation, re-splicing, re-termination and re-testing where required.

✓

Acceptance Documentation

Compilation of test records, fibre schedules, route records and as-built information.

Built to Connect. Powered to Last.

Bring us the route, environment and requirement. Horus-PTS will bring the people, equipment and delivery structure.